Project Lead,  Structural Analysis  and  Construction Follow up:

Healthcare center  in Edvard Grieg’s road, Kolbotn in Oppegård municipality:

Participated as Structural Project Lead  with responsibility of a group of 6 people.

Conducted site follow up related to structural work:

Årvoll Sports Center / Multipurpose Hall:

Participated as Structural Project Lead  –

Conducted site follow up related to structural work:

 

 

Møylandsenter in Andebu / Sandefjord Municipality:

Participated as Structural Project Lead

Conducted site follow up related to structural work:

Sletten Ridesenter, Flesland, Bergen:

Participated as Structural Project Lead:

Conducted site follow up related to structural work:

 

Aurskog og Høland Helthcare center

Participated as a structural project lead

Conducted site follow up related to structural work:

 

Offshore related services in relation to Manufacturing and Release:

Waste Heat Recovery unit installed at Eldfisk Ester, for ConocoPhillips

Fabrication follow up and project services related to loadout and offshore installation

Providing services related to load out and offshore installation.

Design and structural analysis related to offshore modules:

Structural design and analysis of M343 Module for water injection and sulphate removal services 2001

The module was installed  at the Heidrun field in 2002

 

 

Structural design and analysis related to installation of the C17 module at Statfjord C 1997-1998

 

Structural design Work related to Installation of offshore items:

Handling, lifting and seafastening of spoolpieces for offshore installation:

Design of clamps for offshore lifting:

Design of offshore riser base